Colour in various colors
Intensity 1.65- 1.70 kg/L
Viscosity (20C) 7000-10000cP
Mixing ratio (by mass) 22/3
Hardness (Shore A) 79-83
Application time and temperature 10-30 min and 10-25° C
Touch Dry 6-8 hours
Heat Resistance Approximately 100°C (Cured product)
PACKAGING - 22+3 kg metal
A and B components by mass 22 kg A and 3 kg B
Pot Life 15-40 minutes (Varies depending on weather and humidity conditions.)
Application Methods Level comb, trowel, spatula or squeegee.
Equipment Cleaning Ethyl acetate, butyl acetate or cellulosic thinner is used.
Surface Preparation The ground must be clean, dry, free of dust and oil, repaired, and if it is to be applied on concrete, the concrete must be laid at least 22 days ago.
Application Terms There should be no moisture, dust, dirt, rust and oil on the application surface.
All mixed material should be consumed within the usage period.
Application Procedure It is recommended to follow the following rules during application.
22 kg of component A and 3 kg of component B should be mixed with a slow speed mixer for at least 2 minutes. All ingredients should be used without dividing them.
The cap should be closed tightly after the hardener has been used all at once. A notched trowel should be used to apply the adhesive. It must be protected from water for 8-10 hours.
Technical documents are not available for direct download. Leave your details and we will email the document.